Aerospace
Aerospace Bracket Redesign — 40% Cost Reduction
Redesigned a complex welded assembly as a single 5-axis machined part, eliminating 12 welding operations and reducing cost by 40%.
40% cost reduction12 welds operations eliminated3 wk → 5 days lead time
Read case study